LEMON Manuals: Even more car manuals for everyone
Home >> Infiniti >> 2017 >> QX30 Base >> Repair and Diagnosis >> Transmission >> Automatic Trans >> Automatic Transmission (Introduction, Wiring Diagrams And Basic Inspection) >> Basic Inspection >> Additional Service When Replacing Control Valve & TCM >> Work Procedure (Before Replace Control Valve And TCM)

Work Procedure (Before Replace Control Valve And TCM)

  1. SAVE TCM DATA

    G-20 With CONSULT

    1. Select "Work Support" in "TRANSMISSION".
    2. Perform "SAVING DATA FOR REPLC CPU".
    NOTE:
    • Necessary data in TCM is copied and saved to CONSULT.
    • Go to Step 2 regardless of with or without success in saving data.

    GO TO STEP 2  .

  2. SAVE OPERATION LOG'

    G-20 With CONSULT

    Save Operation Log, according to the procedure of "Programming" in CONSULT Operation Manual.

    NOTE:
    • Log in to the network, according to the CONSULT screen.
    • TCM part number is saved in Operating Log saved in CONSULT.
    • After replacing control valve and TCM, perform necessary work.